Grade 12 Archtectural Design

 

WEEK

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Sept 5-9

Labour Day

Course Outline

Introduce Cardboard Boat Project

Internet Research on Cardboard Boats

Working on Boat sketches

Working on Boat sketches

Internet research due

Sept 12-16

Working on mock-ups and testing them for stability and max weight held

Working on mock-ups and testing them for stability and max weight held

Working on mock-ups and testing them for stability and max weight held

Working on mock-ups and testing them for stability and max weight held

Working on Acad Drawing along with cut-out pattern

Working on Acad Drawing along with cut-out pattern

Mock-ups, sketches, and calculations due

Sept 19-23

Working on Acad Drawing along with cut-out pattern

Start manufacturing the real thing out of cardboard with a partner

Personal Orthographic drawing due

Manufacturing real cardboard boat

Check out pictures from 2007 cardboard boat action

Manufacturing real cardboard boat

Manufacturing real cardboard boat

Early Release day

Sept 26 - 30

Manufacturing real cardboard boat

Manufacturing real cardboard boat

Modify drawing so it is as built and submit for marking with boat

Grade 12 Retreat

Manufacturing real cardboard boat

Grade 12 Retreat

Manufacturing real cardboard boat

Grade 12 Retreat

Manufacturing real cardboard boat

(don't forget decorations)

Oct 3-7

Float them or sink them at Brock pool (cardboard boats) all morning

Working on project report for cardboard boats

Photoshop Intro

Cardboard Boat Project Report Due

Photoshop

P.A. Day

Oct 10-14

Thanksgiving Day

Photoshop

Photoshop

Photoshop

Photoshop

Oct 17-21

Photoshop

Photoshop

Photoshop

Photoshop

Photoshop

Oct 24-28

AutoCAD

AutoCAD

AutoCAD

AutoCAD

AutoCAD

Oct 31-Nov 4

AutoCAD

AutoCAD

AutoCAD

AutoCAD

AutoCAD

Nov 7-11

AutoCAD

AutoCAD

AutoCAD

AutoCAD

AutoCAD

Nov 14-18

AutoCAD

AutoCAD

AutoCAD

AutoCAD

AutoCAD

Nov 21-25

Revit

Revit

Revit

Revit

Revit

Nov 28-Dec 2

Revit

Revit

Revit

Revit

Revit

Dec 5-9

Revit

Revit

Revit

Revit

Revit

Dec 12-16

Revit

Revit

Revit

Revit

Revit

Dec 19-23

Revit

Revit

Revit

Revit

Revit

Jan 9-13

Final Project

Final Project

Final Project

Final Project

Final Project

Jan 16-20

Final Project

Final Project

Final Project

Final Project

Final Project

Jan 23-27

Final Project

Final Project

Final Project

Final Project

Final Project