GRADE 12 TECH

WEEK

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Sept 5-9

Labour Day

Course Outline

Introduce Cardboard Boat Project

Orthographic Drawing pg 94 Bar Holder

Internet Research on Cardboard Boats

Working on Boat sketches

Working on Boat sketches

Internet research due

Ortho Dwg Due

Sept 12-16

Working on mock-ups and testing them for stability and max weight held

Working on mock-ups and testing them for stability and max weight held

Orthographic drawing due

Working on mock-ups and testing them for stability and max weight held

Working on mock-ups and testing them for stability and max weight held

Working on Acad Drawing along with cut-out pattern

Working on Acad Drawing along with cut-out pattern

Mock-ups, sketches, and calculations due

Sept 19-23

Working on Acad Drawing along with cut-out pattern

Start manufacturing the real thing out of cardboard with a partner

Personal Orthographic drawing due

Manufacturing real cardboard boat

Check out pictures from 2007 cardboard boat action

Manufacturing real cardboard boat

Manufacturing real cardboard boat

Early release day

Sept 26-30

Manufacturing real cardboard boat

Manufacturing real cardboard boat (don't forget decorations)

Modify drawing so it is as built and submit for marking with boat

Grade 12 Retreat

Manufacturing real cardboard boat

Grade 12 Retreat

Manufacturing real cardboard boat

Grade 12 Retreat

Finished Boat must be in shop with drawing and decorations for evaluation

Oct 3-7

Float them or sink them at Brock pool (cardboard boats) all afternoon

Working on project report for cardboard boats

 

Cardboard Boat Project Report Due

Mcmaster Engneering Olympics

P.A. Day

Oct 10-14

Thanksgiving Day

Introduce Robotics Project

Robotics Internet Research

Working on internet research

Working on design sketches

 

Working on design sketches

Internet research due for Robotics

Oct 17-21

Start Manufacturing Robot Mock-ups

Safety Tours

Safety Tours

Manufacturing Mock-ups

Review use of Vernier

 

Manufacturing Mock-ups

Safety Tours

Manufacturing Mock-ups

Safety Tours

Mock-ups and sketches due for evaluation

Oct 24-28

Big Meeting in groups to decide on preliminary design

Making Full scale mock-up of robot

Begin Drawing robot on Acad and/or Inventor

Making Full scale mock-up of robot

Drawing robot on Acad and/or Inventor

Making Full scale mock-up of robot

Drawing robot on Acad and/or Inventor

Making Full scale mock-up of robot

Sketching full robot

Oct 31-Nov 4

Robot Mock-up Due along with full sketch and explanation of design

Starting to Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Nov 7-11

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Nov 14-18

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Manufacture frame and drive system

Frame and drive system completed for evaluation with acad or inventor dwg

Nov 21-25

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Nov 28-Dec 2

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Dec 5-9

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Manufacture Block pick-up and delivery system

Dec 12-16

Manufacture Ball pick-up system

Manufacture Ball pick-up system

Manufacture Ball pick-up system

Manufacture Ball pick-up system

Manufacture Ball pick-up system

Dec 19-23

Finish Robot

Finish Robot

Finish Robot

Finish Robot

Christmas Vacation

Jan 9-13

Finish Robot

Finish Robot

Finish Robot

Finish Robot

Finish Robot

Jan 16-20

Robot must be finished for Open House Tonight

Robot Finished along with full drawings

Robot Finished along with full drawings

Robot Finished along with full drawings

Robot Finished along with full drawings must be handed in today

Jan 23-27